DOE Occupational Radiation Exposure: 2006 Annual Report
Exhibit B-16. Distribution of TEDE by Facility Type Listed in Descending Order of Average Measurable TEDE for Other, 2006.
OTHER Number of Individuals Receiving Radiation Doses in Each Dose Range (rem) |
||||||||||||||
| Site/Contractor | Less than Meas. | Meas. 0-0.1 | 0.10-0.25 | 0.25-0.50 | 0.50-0.75 | 0.75-1.00 | 1.00-2.00 | 2.0-3.0 | >3 | Total Monitored | Percent of Monitored with Meas. TEDE |
No. with Meas. TEDE |
Collective TEDE (person-rem) |
Avg. Meas. TEDE (rem) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Advancedmed Hanford | 26 | 1 | 27 |
4% |
1 |
0.158 |
0.158 |
|||||||
| Fluor Northwest Services | 73 | 25 | 11 | 4 | 113 |
35% |
40 |
3.948 |
0.099 |
|||||
| ICP - CWI, Construction Subs | 2,142 | 523 | 110 | 35 | 14 | 1 | 4 | 2,829 |
24% |
687 |
58.975 |
0.086 |
||
| Los Alamos National Laboratory | 3,322 | 567 | 73 | 30 | 16 | 9 | 4 | 4,021 |
17% |
699 |
54.098 |
0.077 |
||
| Office of River Protection | 75 | 3 | 1 | 79 |
5% |
4 |
0.301 |
0.075 |
||||||
| Battelle - PNNL | 788 | 60 | 7 | 5 | 860 |
8% |
72 |
4.658 |
0.065 |
|||||
| Westinghouse S.R. Subcontractors | 124 | 6 | 1 | 131 |
5% |
7 |
0.356 |
0.051 |
||||||
| Cogema Engineering Corporation | 26 | 9 | 36 |
28% |
10 |
0.479 |
0.048 |
|||||||
| Fluor Federal Services | 133 | 38 | 3 | 1 | 1 | 176 |
24% |
43 |
2.021 |
0.047 |
||||
| Duratek Federal Services, Inc. | 42 | 10 | 1 | 53 |
21% |
11 |
0.504 |
0.046 |
||||||
| Argonne National Laboratory | 1,324 | 23 | 1 | 1,348 |
2% |
24 |
0.974 |
0.041 |
||||||
| Fluor Hanford, Inc. | 486 | 58 | 5 | 1 | 550 |
12% |
64 |
2.369 |
0.037 |
|||||
| SM Stoller - EM | 4 | 27 | 31 |
87% |
27 |
0.893 |
0.033 |
|||||||
| CH2M Hill Hanford Group, Inc. | 145 | 13 | 158 |
8% |
13 |
0.390 |
0.030 |
|||||||
| Protection Technologies Los Alamos | 45 | 1 | 46 |
2% |
1 |
0.028 |
0.028 |
|||||||
| Bechtel Hanford | 931 | 104 | 5 | 1,040 |
10% |
109 |
2.987 |
0.027 |
||||||
| Idaho Field Office | 35 | 3 | 38 |
8% |
3 |
0.080 |
0.027 |
|||||||
| DOE-Richland Field Office | 530 | 28 | 1 | 559 |
5% |
29 |
0.769 |
0.027 |
||||||
| Duratek Federal Services of Hanford | 43 | 3 | 46 |
7% |
3 |
0.079 |
0.026 |
|||||||
| Johnson Controls, Inc. | 26 | 9 | 1 | 36 |
28% |
10 |
0.256 |
0.026 |
||||||
| Misc. S.R.S. Construction Subcontractors | 84 | 16 | 1 | 101 |
17% |
17 |
0.423 |
0.025 |
||||||
| Sandia National Laboratory | 620 | 40 | 2 | 662 |
6% |
42 |
1.036 |
0.025 |
||||||
| RMI Titanium Company | 48 | 66 | 114 |
58% |
66 |
1.543 |
0.023 |
|||||||
| Wackenhut Services, Inc. - SR | 3 | 2 | 5 |
40% |
2 |
0.033 |
0.017 |
|||||||
| Westinghouse Savannah River Co. | 515 | 88 | 2 | 605 |
15% |
90 |
1.479 |
0.016 |
||||||
| LATA-Sharp Remediation Services, LLC | 16 | 2 | 18 |
11% |
2 |
0.012 |
0.006 |
|||||||
| Advance Technology Laboratories | 27 | 27 |
0% |
0 |
0 |
0 |
||||||||
| Bechtel BWXT Idaho - Construction | 1 | 1 |
0% |
0 |
0 |
0 |
||||||||
| Lockheed Martin Services, Inc. | 29 | 29 |
0% |
0 |
0 |
0 |
||||||||
| Misc DOE Contractors - SR | 18 | 18 |
0% |
0 |
0 |
0 |
||||||||
| NNSA Los Alamos Site Office | 6 | 6 |
0% |
0 |
0 |
0 |
||||||||
| Savannah River Field Office | 10 | 10 |
0% |
0 |
0 |
0 |
||||||||
| Totals | 11,697 | 1,724 | 226 | 76 | 32 | 10 | 8 | 13,773 |
15% |
2,076 |
138.849 |
0.067 |
||
Note: Arrowed values indicate the greatest value in each column.