| DOE Occupational Radiation Exposure: 2007 Annual Report Exhibit B-15. Distribution of TEDE by Facility Type Listed in Descending Order of Average Measurable TEDE for Weapons Fabrication, 2007 |
||||||||||||||||
| WEAPONS FABRICATION |
||||||||||||||||
| Number of Individuals Receiving Radiation Doses in Each Dose Range (rem) | ||||||||||||||||
| Site/Contractor | Less than Meas | Meas 0 - 0.10 | 0.10 - 0.25 | 0.25 - 0.50 | 0.50 - 0.75 | 0.75 - 1.00 | 1 - 2 | 2 - 3 | 3 - 4 | 4 - 5 | >5 | Total Monitored | Percent of Monitored with Meas. TEDE | No. with Meas. TEDE | Collective TEDE (Person-rem) | Avg. Meas. TEDE (rem) |
| B & W - Security | 742 | 7 | 1 | 750 | 1% | 8 | 0.894 | 0.112 | | ||||||||
| B & W Pantex | 3,484 | 224 | 37 | 15 | 9 | 3,769 | 8% | 285 | 23.049 | 0.081 | ||||||
| Sandia National Laboratory | 702 | 37 | 12 | 1 | 752 | 7% | 50 | 3.404 | 0.068 | |||||||
| BWXT Y-12 | 3,605 | 1,010 | 206 | 36 | 5 | 1 | 4,863 | | 26% | | 1,258 | | 74.286 | | 0.059 | |||||
| Westinghouse Savannah River Co. | 411 | 34 | 445 | 8% | 34 | 0.421 | 0.012 | |||||||||
| Honeywell FM&T/KC Production | 69 | 22 | 91 | 24% | 22 | 0.098 | 0.004 | |||||||||
| B & W - Subcontractors | 55 | 55 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| Battelle - Pantex | 1 | 1 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| Los Alamos National Laboratory | 6 | 6 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| PXSO/NNSA and DOE Couriers | 80 | 80 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| Wackenhut Services Inc. - SR | 4 | 4 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| Westinghouse S.R. Subcontractors | 7 | 7 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| Totals | 9,166 | 1,334 | 255 | 52 | 15 | 1 | 10,823 | 15% | 1,657 | 102.152 | 0.062 | |||||
| Note: Arrowed values indicate the the greatest value in each column. | ||||||||||||||||