DOE Occupational Radiation Exposure: 2004 Annual Report
Exhibit B-14. Distribution of TEDE by Facility Type Listed in Descending Order of Average Measurable TEDE for Waste Processing, 2004.
WASTE PROCESSING Number of Individuals Receiving Radiation Doses in Each Dose Range (rem) |
||||||||||||||
| Ops. Office | Site/Contractor | Less than Meas. | Meas. 0-0.1 | 0.10-0.25 | 0.25-0.50 | 0.50-0.75 | 0.75-1.00 | 1.00-2.00 | >2 | Total Monitored | Percent of Monitored with Meas. TEDE |
No. with Meas. TEDE |
Collective TEDE (person-rem) |
Avg. Meas. TEDE (rem) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| AL | Carlsbad Area Misc. Contractors | 481 | 80 | 561 |
14% |
80 |
1.214 |
0.015 |
||||||
| AL | Los Alamos Area Office | 1 | 1 |
0% |
0 |
|||||||||
| AL | Los Alamos National Lab | 60 | 18 | 5 | 83 |
28% |
23 |
0.957 |
0.042 |
|||||
| AL | Sandia National Laboratory | 103 | 26 | 129 |
20% |
26 |
0.721 |
0.028 |
||||||
| AL | Waste Isolation Pilot Project (WIPP) | 51 | 51 |
0% |
0 |
|||||||||
| CH | Argonne National Laboratory - East | 36 | 16 | 4 | 2 | 1 | 59 |
39% |
23 |
2.364 |
0.103 |
|||
| CH | Brookhaven National Lab | 17 | 8 | 6 | 31 |
45% |
14 |
0.999 |
0.071 |
|||||
| ID | Bechtel BWXT Idaho - Construction | 85 | 22 | 3 | 110 |
23% |
25 |
0.830 |
0.033 |
|||||
| ID | Bechtel BWXT Idaho - Services | 191 | 120 | 21 | 5 | 337 |
43% |
146 |
8.068 |
0.055 |
||||
| ID | BNFL - Idaho | 166 | 217 | 71 | 12 | 466 |
64% |
300 |
20.727 |
0.069 |
||||
| RL | Battelle - PNNL | 1 | 1 |
0% |
0 |
|||||||||
| RL | Bechtel Hanford | 3 | 3 |
0% |
0 |
|||||||||
| RL | Bechtel National Corporation | 2 | 2 |
0% |
0 |
|||||||||
| RL | CH2M Hill Hanford Group, Inc. | 845 | 182 | 21 | 2 | 1,050 |
20% |
205 |
10.024 |
0.049 |
||||
| RL | Cogema Engineering Corp | 1 | 1 |
100% |
1 |
0.021 |
0.021 |
|||||||
| RL | Fluor Hanford, Inc. | 1 | 1 | 2 |
50% |
1 |
0.303 |
0.303 |
||||||
| RL | Protection Technology Hanford | 1 | 1 |
0% |
0 |
|||||||||
| SR | Misc. S.R.S. Construction Subcontractors | 40 | 18 | 58 |
31% |
18 |
0.408 |
0.023 |
||||||
| SR | Savannah River Field Office | 40 | 18 | 1 | 59 |
32% |
19 |
0.366 |
0.019 |
|||||
| SR | Wackenhut Services, Inc. - SR | 129 | 72 | 201 |
36% |
72 |
1.283 |
0.018 |
||||||
| SR | Westinghouse S.R. Subcontractors | 89 | 62 | 36 | 4 | 191 |
53% |
102 |
8.338 |
0.082 |
||||
| SR | Westinghouse Savannah River Co. | 1,657 | 968 | 169 | 34 | 5 | 2,833 |
42% |
1,176 |
68.469 |
0.058 |
|||
| Totals | 3,999 | 1,828 | 337 | 60 | 6 | 6,230 |
36% |
2,231 |
125.092 |
0.056 |
||||
Note: Arrowed values indicate the greatest value in each column.