HSS Logo Department of Energy Seal
Left Tab SEARCH Right Tab TOOLS Right Tab Left Tab HOME Right Tab Left Tab ABOUT US Right Tab Left Tab FUNCTIONS Right Tab Left Tab RESOURCES Right Tab Left Tab NEWSFEEDS Right Tab Left Tab VIDEOS Right Tab Left Tab EVENTS
Office of Nuclear Safety
Office of Nuclear Safety Home
Readiness Reviews
Readiness Reviews Home
Applicable Directives, Standards, & Handbooks
Start Up Notifications, Plan of Actions, and Implementation Plans
Functional Area CRADS
Training
425.1D Implementation Procedures
Achieving Readiness
Lessons Learned
Readiness Archives
Library
HSS Logo

Defining the Scope and Graded Approach


Define the scope of the DOE ORR consistent with that of the contractor ORR. Differences between the two result in difficulties in performing the DOE ORR. DOE O 425.1C provides a structure for such consistency. Differences will occur in the evaluation of the Core Requirements specifically related to DOE management, which are necessarily absent from the contractor review.

Going beyond the defined scope in a case where an ongoing program that supports the process or facility under review but which is outside the scope of the review, presents potential problems. If the team is to make a judgment that operations can be conducted safely and it requires investigation at the interface of the process/facility with the supporting program, then going beyond the defined scope is proper.

Define the graded approach as it applies to each CRAD as specifically as possible.