OFFICE OF HEALTH, SAFETY AND SECURITY DEPARTMENTAL REPRESENTATIVE TO THE DNFSB
2000-2 Seal

   Phase II Assessments
   DOE 2000-2 Implementation Plan Status of Phase II Assessments
Date to Board Title System View
October 10, 2002 Department letter enclosing an initial Phase II assessment report from the Kirtland Site Operations Office relative to the 2000-2 implementation plan. ACRR High Bay Ventilation. [PDF]
October 3, 2002 Department letter forwarding an initial Phase II Assessment Report form the Nevada Operations Office, Waste Examination Facility, Visual Examination and Repackaging Building, Confinement Ventilation System relative to the 2000-2 implementation plan. WEF Confinement Ventilation. [PDF]
September 3, 2002 Department letter forwarding an initial Phase II assessment report on Lawrence Livermore National Laboratory Building 625 Fire Sprinkler System relative to the 2000-2 implementation plan. Bldg. 625 Fire Protection. [PDF]
July 23, 2002 Department letter forwarding an initial Phase II assessment report for Los Alamos National Laboratory in relation to the 2000-2 implementation plan. TA-48, RC-1 Fire Sprinklers.
TA-55, PF-4 Fire Alarm System.
[PDF]
July 10, 2002 Department letter forwarding the Initial Phase II report from the Y-12 Area Office, Building 9215 Stack 3 Exhaust System relative to the 2000-2 implementation plan. Bldg. 9215 Stack 3 Exhaust. [PDF]
July 10, 2002 Department letter forwarding an initial Phase II assessment report from the Amarillo Area Office, Pantex Plant System Drawing Program, in relation to the 2000-2 implementation plan. System Drawing Program. [PDF]
May 23, 2002 Department letter forwarding the initial Phase II assessment reports from the Office of River Protection, Richland Operations Office, and Savannah River Operations Office. CWC Fire Protection.
Transfer Leak Detection.
Primary Tank Leak Detection.
[PDF]
April 26, 2002 Department letter forwarding an initial Phase II assessment report form Oak Ridge National Laboratory, Building 3019A, Cell Off-Gas Confinement Ventilation System relative to implementation plan 2000-2. Bldg. 3019 Cell Off-Gas System. [PDF]
April 9, 2002 Department letter forwarding the initial Phase II assessment reports from the Rocky Flats Field Office relative to Implmentation Plan 2000-2. Bldg. 371 Fire Protection.
Bldg. 371 Confinement Vent.
[PDF]
March 28, 2002 Department letter forwarding initial Phase II assessment reports from Carlsbad Field Office and Idaho National Engineering and Environmental Laboratory relative to Implementation Plan 2000-2. NWCF Confinement Ventilation.
Waste Handling Building HVAC
[PDF]

 
Site Map
 References
 Implementation
 Functional Areas