SEARCH TOOLS SITEMAP HOME ABOUT US FUNCTIONS RESOURCES NEWSFEEDS VIDEOS EVENTS
Interface Manual
Errata Sheet
Contents
I. Overview
II. Rec. and Responses
III. Implementation Planning
IV. Safety Issues Management
V. Correspondence Management
VI. Other Communications
VII. Site Interfaces
VIII. Annual Report
IX. Interface Training
Attachments
1. Contractor Requirements Doc.
2. Response to Rec. Guidelines
3. Format Content Guide for IP's
4. Briefing Request Format
5. Board Information
    Request Format
6. Information Request
    Response Format
Reference Material
Departmental Representative
to the DNFSB
Home
Welcome
Archive
Chronological Listing
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
1990-2000
Board Recommendations
Board Recommendations
Rec.2012-1
Rec.2011-1
Rec.2010-2
Rec.2010-1
Rec.2009-2
Rec.2009-1
Rec.2008-1
Rec.2007-1
Rec.2005-1
Rec.2004-2
Rec.2004-1
Rec.2002-3
Rec.2000-1
Public Meetings and Hearings
SIMS
SIMS Logon
Letter Commitments
Recommendation Commitments
Board Review of Directives
About Our Office
Mission and Functions
Policy on Board Interaction
Recommendation Contact
DOE Site Contacts
Office Assignments
Our Office Contacts
Interface Workshop
Web Sites Related to Our Office
About the Board
General Description
Board Members
Board Mission and Functions
Board Enabling Legislation
Safety Oversight Principles
Board Policy Statements
Board Strategic Plan
Performance Report
Board Web Site
Road Map to the Board
Board Web Site
Contact Us
Quick Reference
Facility Representative
Safety System Oversight
Federal Technical Capability Panel
DOE Integrated Safety Management
DOE Directives Program
DOE Technical Standards Program
DOE Phone Book
Interface Manual Home
Interface Manual   
DOE M 140.1-1B Interface with the DNFSB   

BackNext Printable
copy
  Comment


CONTENTS

I.   OVERVIEW
1. INTRODUCTION
2.     REFERENCES
3.      RESPONSIBILITIES
a. Secretary of Energy
b. Deputy Secretary of Energy
c. Secretarial Officers
d. Operations/Area Office Managers with Responsibility for Defense Nuclear Facilities
e. Departmental Representative to the Board
f. Responsible Managers
g. Issue Lead
h. Points of Contact
i. Departmental Personnel

II.     RECOMMENDATIONS AND RESPONSES
1. BOARD RECOMMENDATIONS
2.     RESPONDING TO A RECOMMENDATION
3.      ACCEPTING A RECOMMENDATION
4. REQUESTING A RESPONSE EXTENSION
5. REJECTING A RECOMMENDATION, IN WHOLE OR IN PART

III.    IMPLEMENTATION PLANNING
1. IMPLEMENTATION PLAN DEVELOPMENT
a. Team Leadership
b. Internal Coordination
c. Interaction with the Board and its Staff
d. Schedule, Cost, and Funding
2. IMPLEMENTATION PLAN FORMAT AND CONTENT
3. TRANSMITTAL OF IMPLEMENTATION PLANS
4. EXTENSION NOTIFICATION
5 BOARD ACCEPTANCE
6. PLAN IMPLEMENTATION
7. REPORTING THAT IMPLEMENTATION IS IMPRACTICABLE
8. CHANGES TO IMPLEMENTATION PLANS
9. IMPLEMENTATION IN EXCESS OF 1 YEAR OF DURATION
10. CLOSURE OF RECOMMENDATIONS

IV.    SAFETY ISSUES MANAGEMENT
1.      IDENTIFYING SAFETY ISSUES
2. MAKING COMMITMENTS
3. TRACKING COMMITMENTS
4. REVISING COMMITMENTS
5 CLOSING COMMITMENTS

V. CORRESPONDENCE MANAGEMENT
1.   INCOMING CORRESPONDENCE
2.     OUTGOING CORRESPONDENCE
3. DISTRIBUTION AND RETENTION
4. INFORMATION ARCHIVE

VI. OTHER COMMUNICATIONS
1. BOARD REQUESTS FOR INFORMATION
a. Responses to Information Requests
b. On-site Requests for Information by the Board
c. Requests for In-process or Draft Documentation.
d. Formal Reporting Requirements
e.   Standing Request for Departmental Evaluations and Assessments
2. PUBLIC MEETINGS AND OTHER FORMAL BOARD MEETINGS
a.   Coordination, Preparation, and Participation
b.   Internal Notice of Meetings
c.   Notice to the Board of Expected Meeting Attendees
d. Documentation of Meeting Results
e. Price Anderson Enforcement Process
3. BRIEFINGS, DISCUSSIONS, TELEPHONE COMMUNICATIONS, AND OTHER INFORMAL INTERACTIONS

VII.     SITE INTERFACES
1.      PREPARATION FOR SITE VISITS
a.       Schedules and Visit Plans
b. Board/Board Staff Requests for Site Visit
c. Responsibilities for Site Visit Preparation, Coordination and Conduct
d. Internal Notice of Site Visits
e.   Site Access Coordination. 
f.   Access to Subject Matter Experts
2. SITE VISIT PROTOCOL
a.   Entrance Briefings
b.   Facility Tours
c.   Document Reviews
d. Site Visit Briefings
e. Personnel Interviews
f. Potential or Actual Unsafe Conditions
g. Exit Briefings
f. Visit Summaries
i. Extended Site Visits
3. INTERFACE AT FACILITIES WITH BOARD SITE REPRESENTATIVES

VIII.     ANNUAL REPORT TO CONGRESS

IX.       INTERFACE TRAINING

ATTACHMENTS
1.   CONTRACTOR REQUIREMENTS DOCUMENT
2. RESPONSE TO RECOMMENDATION GUIDELINES 
3. FORMAT AND CONTENT GUIDE FOR IMPLEMENTATION PLANS
4. BRIEFING REQUEST FORMAT FOR DEFENSE NUCLEAR FACILITIES SAFETY BOARD 
5. BOARD INFORMATION REQUEST FORMAT
6. INFORMATION REQUEST RESPONSE FORMAT

 

FIGURES: 
 Figure 1 Recommendation Process Overview
 Figure 2 Department Response Process Overview
 Figure 3A Implementation Planning Process Overview
 Figure 3B Implementation Planning Process Overview (Part 2)




  Printable
copy
  Comment
U.S. Department of Energy   l    1000 Independence Avenue, SW   l    Washington, DC 20585   l    1.800.dial.DOE
Link: The White House Link: USA.gov Link: Spanish USA.gov Link: E.gov Link: Information Quality Link: Freedom of Information Act