SEARCH
TOOLS
SITEMAP
HOME
ABOUT US
FUNCTIONS
RESOURCES
NEWSFEEDS
VIDEOS
EVENTS
Interface Manual
Errata Sheet
Contents
I.
Overview
II.
Rec. and Responses
III.
Implementation Planning
IV.
Safety Issues Management
V.
Correspondence Management
VI.
Other Communications
VII.
Site Interfaces
VIII.
Annual Report
IX.
Interface Training
Attachments
1.
Contractor Requirements Doc.
2.
Response to Rec. Guidelines
3.
Format Content Guide for IP's
4.
Briefing Request Format
5.
Board Information
Request Format
6.
Information Request
Response Format
Reference Material
Departmental Representative
to the DNFSB
Home
Welcome
Archive
›
Chronological Listing
›
2012
›
2011
›
2010
›
2009
›
2008
›
2007
›
2006
›
2005
›
2004
›
2003
›
2002
›
2001
›
1990-2000
Board Recommendations
›
Board Recommendations
›
Rec.2012-1
›
Rec.2011-1
›
Rec.2010-2
›
Rec.2010-1
›
Rec.2009-2
›
Rec.2009-1
›
Rec.2008-1
›
Rec.2007-1
›
Rec.2005-1
›
Rec.2004-2
›
Rec.2004-1
›
Rec.2002-3
›
Rec.2000-1
Public Meetings and Hearings
SIMS
›
SIMS Logon
›
Letter Commitments
›
Recommendation Commitments
Board Review of Directives
About Our Office
›
Mission and Functions
›
Policy on Board Interaction
›
Recommendation Contact
›
DOE Site Contacts
›
Office Assignments
›
Our Office Contacts
›
Interface Workshop
›
Web Sites Related to Our Office
About the Board
›
General Description
›
Board Members
›
Board Mission and Functions
›
Board Enabling Legislation
›
Safety Oversight Principles
›
Board Policy Statements
›
Board Strategic Plan
›
Performance Report
›
Board Web Site
›
Road Map to the Board
Board Web Site
Contact Us
Quick Reference
Facility Representative
Safety System Oversight
Federal Technical Capability Panel
DOE Integrated Safety Management
DOE Directives Program
DOE Technical Standards Program
DOE Phone Book
Interface Manual
DOE M 140.1-1B Interface with the DNFSB
Back
Next
Printable
copy
Comment
CONTENTS
I.
OVERVIEW
1.
INTRODUCTION
2.
REFERENCES
3.
RESPONSIBILITIES
a.
Secretary of Energy
b.
Deputy Secretary of Energy
c.
Secretarial Officers
d.
Operations/Area Office Managers with Responsibility for Defense Nuclear Facilities
e.
Departmental Representative to the Board
f.
Responsible Managers
g.
Issue Lead
h.
Points of Contact
i.
Departmental Personnel
II.
RECOMMENDATIONS AND RESPONSES
1.
BOARD RECOMMENDATIONS
2.
RESPONDING TO A RECOMMENDATION
3.
ACCEPTING A RECOMMENDATION
4.
REQUESTING A RESPONSE EXTENSION
5.
REJECTING A RECOMMENDATION, IN WHOLE OR IN PART
III.
IMPLEMENTATION PLANNING
1.
IMPLEMENTATION PLAN DEVELOPMENT
a.
Team Leadership
b.
Internal Coordination
c.
Interaction with the Board and its Staff
d.
Schedule, Cost, and Funding
2.
IMPLEMENTATION PLAN FORMAT AND CONTENT
3.
TRANSMITTAL OF IMPLEMENTATION PLANS
4.
EXTENSION NOTIFICATION
5
BOARD ACCEPTANCE
6.
PLAN IMPLEMENTATION
7.
REPORTING THAT IMPLEMENTATION IS IMPRACTICABLE
8.
CHANGES TO IMPLEMENTATION PLANS
9.
IMPLEMENTATION IN EXCESS OF 1 YEAR OF DURATION
10.
CLOSURE OF RECOMMENDATIONS
IV.
SAFETY ISSUES MANAGEMENT
1.
IDENTIFYING SAFETY ISSUES
2.
MAKING COMMITMENTS
3.
TRACKING COMMITMENTS
4.
REVISING COMMITMENTS
5
CLOSING COMMITMENTS
V.
CORRESPONDENCE MANAGEMENT
1.
INCOMING CORRESPONDENCE
2.
OUTGOING CORRESPONDENCE
3.
DISTRIBUTION AND RETENTION
4.
INFORMATION ARCHIVE
VI.
OTHER COMMUNICATIONS
1.
BOARD REQUESTS FOR INFORMATION
a.
Responses to Information Requests
b.
On-site Requests for Information by the Board
c.
Requests for In-process or Draft Documentation.
d.
Formal Reporting Requirements
e.
Standing Request for Departmental Evaluations and Assessments
2.
PUBLIC MEETINGS AND OTHER FORMAL BOARD MEETINGS
a.
Coordination, Preparation, and Participation
b.
Internal Notice of Meetings
c.
Notice to the Board of Expected Meeting Attendees
d.
Documentation of Meeting Results
e.
Price Anderson Enforcement Process
3.
BRIEFINGS, DISCUSSIONS, TELEPHONE COMMUNICATIONS, AND OTHER INFORMAL INTERACTIONS
VII.
SITE INTERFACES
1.
PREPARATION FOR SITE VISITS
a.
Schedules and Visit Plans
b.
Board/Board Staff Requests for Site Visit
c.
Responsibilities for Site Visit Preparation, Coordination and Conduct
d.
Internal Notice of Site Visits
e.
Site Access Coordination.
f.
Access to Subject Matter Experts
2.
SITE VISIT PROTOCOL
a.
Entrance Briefings
b.
Facility Tours
c.
Document Reviews
d.
Site Visit Briefings
e.
Personnel Interviews
f.
Potential or Actual Unsafe Conditions
g.
Exit Briefings
f.
Visit Summaries
i.
Extended Site Visits
3.
INTERFACE AT FACILITIES WITH BOARD SITE REPRESENTATIVES
VIII.
ANNUAL REPORT TO CONGRESS
IX.
INTERFACE TRAINING
ATTACHMENTS
1.
CONTRACTOR REQUIREMENTS DOCUMENT
2.
RESPONSE TO RECOMMENDATION GUIDELINES
3.
FORMAT AND CONTENT GUIDE FOR IMPLEMENTATION PLANS
4.
BRIEFING REQUEST FORMAT FOR DEFENSE NUCLEAR FACILITIES SAFETY BOARD
5.
BOARD INFORMATION REQUEST FORMAT
6.
INFORMATION REQUEST RESPONSE FORMAT
FIGURES:
Figure 1
Recommendation Process Overview
Figure 2
Department Response Process Overview
Figure 3A
Implementation Planning Process Overview
Figure 3B
Implementation Planning Process Overview (Part 2)
Printable
copy
Comment
CONTACT US
l
DOING BUSINESS WITH DOE
l
DOE TELEPHONE DIRECTORY
l
DOE DIRECTIVES
l
SMALL BUSINESS
U.S. Department of Energy
l 1000 Independence Avenue, SW l Washington, DC 20585 l 1.800.dial.DOE
SECURITY/PRIVACY NOTICE
l
INFORMATION COLLECTION
l
INFORMATION INVENTORY
l
WEB POLICIES
l
NO FEAR ACT