|
|
 |
WIPP

No document links for 2013
|
- September 27, 2012, Department letter responding to the Board letter of June 27, 2012, regarding safety issues with the maintenance program at the Waste Isolation Pilot Plant (WIPP). [PDF]
- June 27, 2012, Board letter establishing a 90-day reporting requirement identifying actions taken or planned by DOE to resolve safety issues associated with the maintenance program at the Waste Isolation Pilot Plant. [PDF]
|
- December 21, 2011, Department letter responding to the Board’s letter of June 24, 2011, regarding actions taken or planned to address weaknesses in the fire protection program at WIPP. [PDF]
- June 24, 2011, Board letter establishing a 180-day reporting requirement on actions taken or planned by DOE to address weaknesses in the fire protection program at WIPP. [PDF]
- January 20, 2011, Department letter transmitting the response to the Board's October 22, 2010 report regarding work planning and control at the Waste Isolation Pilot Plant. [PDF]
|
- December 21, 2010, Department letter providing corrective action plan for the electrical safety program at WIPP in response to the September 22, 2010 Board letter. [PDF]
- October 22, 2010, Board letter establishing a 90-day reporting requirement for a report on actions to correct work planning and control deficiencies at WIPP. [PDF]
- September 22, 2010, Board letter establishing a 90-day reporting requirement to provide a report on deficiencies in the electrical safety program and the 480V Motor Control Center in the Fire Water Pump Building at the Waste Isolation Pilot Plant. [PDF]
|
No document links for 2009
|
No document links for 2008
|
No document links for 2007
|
No document links for 2006
|
No document links for 2005
|
- October 1, 2004, Department letter providing status of the wet combustible transuranic waste shipments from the Rocky Flats Environmental Technology Site. [HTML] [PDF] [DOC]
- August 6, 2004, Department letter regarding Waste Isolation Pilot Plant Mobile Characterization Unit Generic Documented Safety Analysis. [HTML] [PDF] [DOC]
- June 17, 2004, Department letter requesting a 60-day extension to respond to Board letter dated May 3, 2004, regarding authorization basis for the Waste Isolation Pilot Plant mobile characterization units. [HTML] [PDF] [DOC]
- May 3, 2004, Board letter establishing a 45-day reporting requirement regarding authorization basis for the Waste Isolation Pilot Plant mobile characterization units. [HTML] [PDF] [DOC]
|
No document links for 2003
|
No document links for 2002
|
No document links for 2001
No document links for 2000
- May 6, 1999, Board letter forwarding a staff issue
report on observations of first waste receipt and disposal placement at WIPP. [PDF]
No document links for 1998
No document links for 1997
- February 8, 1996, Board letter forwarding staff issue report on National Transuranic Waste Program. [PDF] [PDF]
No document links for 1995
No document links for 1994
No document links for 1993
- August 28, 1992, Board staff trip report with outside experts (MITRE Corporation) to WIPP. [PDF]

|
 |
 |
|