SEARCH TOOLS SITEMAP HOME ABOUT US FUNCTIONS RESOURCES NEWSFEEDS VIDEOS EVENTS
Departmental Representative
to the DNFSB
Home
Welcome
Archive
Chronological Listing
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
1990-2001
Board Recommendations
Board Recommendations
Rec.2012-2
Rec.2012-1
Rec.2011-1
Rec.2010-2
Rec.2010-1
Rec.2009-2
Rec.2009-1
Rec.2005-1
Rec.2004-2
Rec.2004-1
Rec.2002-3
Rec.2000-1
Public Meetings and Hearings
SIMS
SIMS Logon
Letter Commitments
Recommendation Commitments
Board Review of Directives
About Our Office
Mission and Functions
Policy on Board Interaction
Recommendation Contact
DOE Site Contacts
Office Assignments
Our Office Contacts
Interface Workshop
Web Sites Related to Our Office
Interface Manual
About the Board
General Description
Board Members
Board Mission and Functions
Board Enabling Legislation
Safety Oversight Principles
Board Policy Statements
Board Strategic Plan
Performance Report
Board Web Site
Road Map to the Board
Board Web Site
Contact Us
Quick Reference
Facility Representative
Safety System Oversight
Federal Technical Capability Program
DOE Integrated Safety Management
DOE Directives Program
DOE Technical Standards Program
DOE Phone Book
HSS Logo
Information Archive Homepage
CHRONOLOGICAL LISTING  

2013


APRIL
  • April 30, 2013, Department letter transmitting the second deliverable for Action 1-8 of the Implementation Plan for Recommendation 2011-1, Safety Culture at the Waste Treatment and Immobilization Plant. [PDF]
  • April 22, 2013, Board letter stating that the Board closes Recommendation 2008-1, Safety Classification of Fire Protection Systems. [PDF]
  • April 19, 2013, Department letter notifying the Board that DOE is executing a 45 day extension for completing the implementation plan for Recommendation 2012-2, Hanford Tank Farms Flammable Gas Safety Strategy. [PDF]
  • April 16, 2013, Board letter stating that the Board reserves acceptance of DOE’s Implementation Plan for Recommendation 2012-1, Savannah River Site Building 235-F Safety, until receipt and review of the Building 235-F project Deactivation Plan. [PDF]
  • April 11, 2013, Department letter providing the National Nuclear Security Administration's update of activities relating to commitments 505 and 511 of the Implementation Plan for DNFSB Recommendation 2000-1, Prioritization for Stabilizing Nuclear Materials. [PDF]
  • April 3, 2013, Department letter transmitting deliverable 3-3 (Updated Building 235-F Drill Plan) of the Implementation Plan for Recommendation 2012-1, Savannah River Site Building 235-F Safety. [PDF]
  • April 1, 2013, Department letter transmitting deliverable 2c-2 (Building 235-F fire detection and alarm systems (FDAS) enhancement study) of the Implementation Plan for Recommendation 2012-1, Savannah River Site Building 235-F Safety. [PDF]

Back to Top

MARCH
  • March 27, 2013, Board letter transmitting its Twenty-Third Annual Report to Congress for Calendar Year 2012. [PDF]
  • March 27, 2013, Department letter in response to the Board’s letter of January 3, 2013, concerning DOE senior leadership’s assessment of the current state of public and worker protection for seismic accident scenarios, and the risk reduction measures to be applied to mitigate near term seismic risks of the Plutonium Facility (PF-4) at Los Alamos National Laboratory. [PDF]
  • March 25, 2013, Department letter transmitting the DOE Annual Report on Nuclear Criticality Safety for Fiscal Year 2012. [PDF]
  • March 22, 2013, Department letter transmitting deliverable 2B-1 (Documented review of the Building 235-F electrical components, plan for de-energization, and process for control of the resultant configuration) of the Implementation Plan for Recommendation 2012-1, Savannah River Site Building 235-F Safety. [PDF]
  • March 21, 2013, Department letter reporting completion of all actions in the Implementation Plan for Recommendation 2008-1, Safety Classification of Fire Protection Systems.  [PDF]
  • March 19, 2013, Board letter closing Recommendation 2007-1, Safety-Related In Situ Nondestructive Assay of Radioactive Materials. [PDF]
  • March 4, 2013, Department letter informing the Board that DOE has completed the implementation of the Tank Farms Documented Safety Analysis upgrade. [PDF]
  • March 3, 2013, Department letter transmitting deliverable 2A-2 (Evaluate fixed combustibles and define the fixed combustible removal, encapsulation, or isolation scope) of the Implementation Plan for Recommendation 2012-1, Savannah River Site Building 235-F Safety. [PDF]

Back to Top

FEBRUARY
  • February 28, 2013, Department letter transmitting deliverable 3-2 (Documented review of the existing protective action plans and procedures to ensure that all F-Area tenants are protected from the hazards associated with a radiological release from Building 235-F) of the Implementation Plan for Recommendation 2012-1, Savannah River Site Building 235-F Safety. [PDF]
  • February 25, 2013, Board letter establishing a 90-day reporting requirement regarding plans and schedules for actions to ensure the proper operability and reliability of fire protection systems at the Pantex Plant. [PDF]
  • February 20, 2013, Department letter reporting actions the NNSA has taken or plans to take to ensure the Lawrence Livermore National Laboratory Plutonium Facility's Glovebox System and Fire Detection and Alarm System can perform their safety functions. This letter also provides a report on actions NNSA has taken to resolve the other issues noted in the Board’s letter of December 13, 2011. [PDF]
  • February 13, 2013, Department letter transmitting deliverable 2a-1 (Transient Combustible Control Program Description for Building 235-F) of the Department of Energy's Implementation Plan for Recommendation 2012-1, Savannah River Site Building 235-F Safety. [PDF]
  • February 11, 2013, Department letter transmitting the report "Independent Oversight Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project", in completing Action 2-6 in the Department of Energy's Implementation Plan for Recommendation 2011-1, Safety Culture at the Waste Treatment and Immobilization Plant. [PDF]

Back to Top

JANUARY
  • January 31, 2013, Department letter transmitting deliverable 3-1 (Emergency Preparedness drill schedule for Calendar Year 2013) of the Implementation Plan for Recommendation 2012-1, Savannah River Site Building 235-F Safety. [PDF]
  • January 31, 2013, Department letter in response to the Board letter of August 30, 2012, concerning the adequacy of the development, review, and approval of safety control strategies for nuclear operations at Lawrence Livermore National Laboratory. [PDF]
  • January 16, 2013, Department letter responding to the Board letter of November 19, 2012, concerning the nuclear facility safety basis for Area G at Los Alamos National Laboratory. [PDF]
  • January 16, 2013, Department letter requesting a 30-day extension to transmit the Department’s Annual Report on Nuclear Criticality Safety for Fiscal Year 2012.  [PDF]
  • January 7, 2013, Department letter accepting Board Recommendation 2012-2, Hanford Tank Farms Flammable Gas Safety Strategy. [PDF]
  • January 3, 2013, Board letter forwarding Technical Report DNFSB/TECH-38, Storage Conditions of Reactive Metal Fuel in L-Basin at the Savannah River Site. [PDF]
  • January 3, 2013, Department letter transmitting the Technical Work Plan and Project Plan of DOE’s project to develop verification and validation test problems and solutions for the System for Analysis of Soil-Structure Interaction (SASSI) computer code. [PDF]
  • January 3, 2013, Board letter establishing a 60-day reporting requirement for DOE senior leadership’s assessment of the current state of public and worker protection for seismic accident scenarios, and the risk reduction measures to be applied to mitigate near term seismic risks of the Plutonium Facility (PF-4) at Los Alamos National Laboratory.  [PDF]

Back to Top

U.S. Department of Energy   l    1000 Independence Avenue, SW   l    Washington, DC 20585   l    1.800.dial.DOE
Link: The White House Link: USA.gov Link: Spanish USA.gov Link: E.gov Link: Information Quality Link: Freedom of Information Act