January 24, 2007
The Honorable James A. Rispoli
U.S. Department of Energy
1000 Independence Avenue, SW
Washington, DC 20585-0113
Dear Mr. Rispoli:
The Defense Nuclear Facilities Safety Board (Board) and its staff have closely followed conceptual and preliminary design activities, pilot plant testing, and safety basis development for the Integrated Waste Treatment Unit (IWTU) at the Idaho National Laboratory. The Board acknowledges approval of the Critical Decision 2/3B milestone, formally establishing the project’s performance baseline and authorizing long-lead procurement of major process equipment and early site work. The overall safety strategy as discussed in the enclosed project summary appears sound, and the preliminary design of important process systems that confine and control hazardous materials is conservative. The Board has no significant safety issues with the project at this time (Critical Decision 2/3B). The final design, however, is progressing and there remain a number of items the Board believes must be addressed before the approval of final design and construction of the project. These items are listed below for your information:
In addition to these items, the Board encourages the IWTU project to consider incorporating limited, post-seismic monitoring capability into the IWTU control system as defense-in-depth assurance of safe shutdown. Currently, no seismically qualified system exists to verify safe shutdown following an earthquake.
The Board commends DOE for considering a potential future mission in this facility.
Further, DOE convened an expert panel early in preliminary design to confirm that the design of the facility could accommodate this mission. The Board is encouraged by the project’s commitment to address this panel’s recommendations.
Interaction between our staff and IWTU project personnel has been productive thus far, and we look forward to continuing this dialogue in the future.
Sincerely,
A. J.
Eggenberger
Chairman
c: The Honorable David K. Garman
Mr. Mark B. Whitaker, Jr.
Enclosure
Enclosure
Integrated
Waste Treatment Unit Project Summary
The Integrated Waste Treatment Unit (IWTU) will convert approximately 900,000 gallons of acidic, liquid sodium bearing waste to a solid carbonate or mineralized product for permanent disposal at the Waste Isolation Pilot Plant or an off-site geologic repository. The sodium bearing waste is currently stored in three tanks at the Idaho Nuclear Technology and Engineering Center (INTEC) and will be treated using steam reforming technology. The IWTU will also stabilize liquid wastes generated from continued cleanup of the INTEC area. Portions of the facility’s structure may have a future mission to support the recovery of High-Level-Waste Calcine for off-site disposal, and are thus being designed to more rigorous structural requirements.
The safety strategy relies on confinement of hazardous materials, radiation shielding, and accident prevention during steam reforming and waste product handling operations. Significant hazards include mercury release from a charcoal adsorber bed fire, hydrogen deflagration in process equipment, and confinement boundary failure resulting in release during a seismic event. Engineered and administrative controls will prevent and mitigate worker consequences from these and other events identified in safety basis documents. Controls credited as safety-significant for the IWTU include the following:
To provide additional worker protection, all components providing primary confinement of the waste during operations with the exception of the RH-TRU canister are credited as defense-in-depth. The building ventilation system is also credited as defense-in-depth, and a Technical Safety Requirement level control will require cessation of steam reforming operations if the system becomes inoperable.
A
one-tenth scale pilot plant was constructed at Hazen Research, Inc. to
demonstrate integrated operation of the IWTU process, confirm process chemistry
and mass and energy balance calculations, and demonstrate acceptability
of the waste product and off-gas emissions. The first stage of testing produced a
carbonate waste form. Valuable lessons
learned were derived from this effort including, among others, the
acceptability of sintered metal in the high temperature process gas filter and
the control set to prevent and mitigate a charcoal adsorber
bed fire. Testing for the mineralized
waste form was completed at the end of 2006.
The
project is now moving forward into final design and is preparing for long-lead procurement
of major process equipment.