The purpose of this letter is to
provide a revision to Commitment 4.2.1.3 in the Department’s Implementation
Plan for Software Quality Assurance (SQA) in response to Defense Nuclear
Facilities Safety Board (Board) Recommendation 2002-1. Commitment 4.2.1.3, due in November 2003,
required the Department to perform a gap analysis on the six toolbox codes to
determine the actions needed to bring the codes into compliance with SQA
criteria and to develop a schedule with milestones to upgrade each code based
on the gap analysis results.
Since March 2003 when the
Implementation Plan was approved, the scope of this commitment has evolved
based on experience gained. Additional
departmental peer and code developer reviews are being performed to finalize
the six gap analyses reports. On
December 3, 2003, when we reported this commitment as partially complete, three
of the six gap analyses reports were submitted as interim reports, for the
codes MACCS2, ALOHA, and EPICODE. On
January 29, 2004, the remaining three gap analysis interim reports, for the
codes MELCOR, GENII, and CFAST, were completed. The interim gap analyses reports concluded
that software-induced errors did not exist in the codes that would have led to
non-conservatisms at defense nuclear facilities. However, the Department believes that the
additional reviews are necessary and will further improve the technical accuracy
of the gap analyses effort.
Since the Department does not
own the six toolbox codes, a firm
schedule with milestones
for upgrading each code cannot be developed in time to be included in the final
gap analysis reports as originally conceived. The interim gap analyses reports do include an
estimate of the level of effort required to upgrade each code. The Office of Environment, Safety and Health
(EH) is also working with program Secretarial Offices and the toolbox code
developers to evaluate the feasibility for conducting upgrades to the existing
codes.
Completing the additional code
developer and peer reviews will extend delivery of the final gap analysis
reports to May 2004. The delay in completing
this commitment will not impact other ongoing SQA Implementation Plan
activities. The Department will complete
its evaluation of the feasibility for conducting toolbox code upgrades, define
the path forward, schedule, and milestones, and provide the results in the
October 2004 periodic Board briefing. Due to the fact that these changes only affect
this one commitment, a revision of the entire 2002-1 Implementation Plan is
considered unnecessary.
If you have any questions,
please contact me or have members of your staff contact Mr. Frank B. Russo at
(301) 903-8008.
Sincerely,
Spencer Abraham
cc:
Kyle E. McSlarrow, S-2
David K. Garman, S-3
Mark B. Whitaker, DR-1
Frank B. Russo, EH-3