November3, 2004
The Honorable Linton Brooks
Administrator
National Nuclear Security Administration
U.S. Department of Energy
1000 Independence Avenue, SW
Washington, DC 20585-0701
Dear Ambassador Brooks:
In recent months, the National Nuclear Security
Administration (NNSA) has indicated plans and proposals for a significant
increase in the scope and operational tempo of activities at the Device Assembly
Facility (DAF) at the Nevada Test Site. These
plans and proposals include the receipt and storage of special nuclear
material, the installation and operation of equipment to perform criticality
experiments formerly conducted at the Technical Area (TA)-18 facility at Los Alamos
National Laboratory, the conduct of nuclear explosive operations for weapon dismantlement,
transition to an 18-month readiness to support underground nuclear testing, and
support of the Radiological/Nuclear Counterterrorism Technology Evaluation
Complex. The DAF is also expected to
continue to contribute to the ongoing subcritical experiments program and the
JASPER (Joint Actinide Shock Physics Experimental Research) project. Further, NNSA’s current planning indicates
that a number of these important activities may be conducted in a simultaneous
operational environment. In general, the
Defense Nuclear Facilities Safety Board (Board) supports NNSA’s decision to
utilize the capabilities at the DAF more fully.
However, most of these proposed activities would not only utilize the capabilities of DAF more fully, but would introduce activities not considered in the design of the facility. Introducing activities that were not considered in the design of the facility merits a comprehensive review. In addition, the DAF was designed and constructed in the early 1990s. The design and construction of the facility predate some modern nuclear safety requirements and may not be consistent with current expectations of the Department of Energy (DOE).
In recent reviews of the DAF the Board’s staff has observed a number of significant deficiencies indicating that NNSA may not have devoted sufficient resources to the facility’s critical safety management programs and the facility’s physical infrastructure. For example, the staff has noted issues with respect to the scope of the safety basis of the facility, the reliability of the safety-class fire suppression system, the adequacy of the activity-level work planning and control process and the quality assurance program. In particular, a recent NNSA review of the DAF training program determined that it did not meet 6 of the 8 basic program requirements.
Other programs critical to safety in nuclear facilities,
such as configuration management, maintenance, and radiation protection, may
also require attention. These, deficiencies need to be identified and corrected
prior to significantly increasing the pace of operations and adding new missions.
The Board believes that, because of the dramatic increase in
scope and operational tempo of high-hazard and vitally important national security
missions at the DAF, additional focus is necessary to ensure that safety
management programs are being implemented with a sufficient degree of rigor and
that required safety systems are being maintained in a state of high reliability.
Although there may be a tendency to rely
on the Operational Readiness Review (ORR) process to provide this assurance,
DOE’s requirements associated with ORRs are generally focused on verifying,
through a sampling review, the operational attributes of the activity being reviewed.
The ORR process does not provide a
comprehensive assessment of those programs and may not identify deficiencies in
the reliability of safety systems.
Therefore, pursuant to 42 U.S.C. § 2286b(d), the Board
requests that NNSA provide a report to the Board within 90 days of receipt of
this letter on the actions that will be taken to identify and correct any
deficiencies in the DAF facility, its equipment, or safety management programs
to ensure the safety of ongoing and planned mission activities.
Sincerely,
John T. Conway
Chairman