NUREG/CP-0167
Conf-980803
Due to the large size of this document it has been broken down
into smaller PDF files. To view them you can download, free, Adobe Acrobat
Reader (
) by clicking
here.
Keynote Address: Operational Formality For Confinement
Ventilation Systems: Some Lessons
Invitied Speaker: Nuclear Utilities In A Competitive
World
Current IAEA Activities In Radioactive Waste Management
Filters and Filter Testing
Monday August 3, 1998
Critical Review: Filters and Filtration For Nuclear
Applications
HEPA Filter Media Testing: 1950 - 2000
A New Concept For Qualification Assurance of HEPA
Filter Mechanical Reliability
ATI TDA 5A Aerosol Generator Evaluation
Circular HEPA Filters For Use In Nuclear Containment
And Ventilation Systems
Improved HEPA Filter/Barrier Technique For Waste
Handling And Processing
Nuclear Codes And Standards
Tuesday August 4, 1998
Critical Review: A Critical Assessment Of Codes
And Standards For Nuclear Air And Gas Treatment
ASME Code On Nuclear Air And Gas Treatment AG-1
Ventilation Air Cleaning Equipment Codes
Emerging ASME AG-1 Code: Article F1, On Metal Medium
Filters
Working Luncheon
Tuesday August 4, 1998
Invited Speaker: Regulatory Trends
Sampling and Testing
Tuesday August 4, 1998
ASME N510 Testing Of Non-N509 Systems
Mixing To Achieve Conditions Suitable For Single
Point Sampling In Stacks And Ducts
In-Situ Pas For Post Accident Management
A New Electrostatic Radon Progeny Collection Method
Open End
Tuesday August 4, 1998
Critical Review Of DOE's Ventilation And Filtration
Standards
Adsorbers And Adsorbents
Wednesday August 5, 1998
Critical Review: History Of Radioiodine Control
Laboratory Testing Of Nuclear Grade Activated Charcoal
Refrigerant Loading Effects On Carbon During Bypass
Leakage Testing
Investigation Of Shock/Acceleration Requirements
For Carbon Filters
Replacement Of Quad Cities Nuclear Power Station
SBGT System Charcoal Adsorber Trays
Deep Bed Charcoal Filter Retention Screen In-Place
Replacement And Repair
HVAC Systems For Control Rooms
And Other Nuclear Facilities
Wednesday August 5, 1998
Control Room Envelope Reconstitution
Control Room Air Leakage Testing At Two Nuclear
Power Plants
Leakage Testing of Installed Dampers Using A Constant
Injection Tracer Gas Technique
Low Flow Containment And Ventilation Design For
Nuclear Installations
Determination Of The Watts Bar Nuclear Plant Diesel
building Ventilation Systems Requirements
Guidance For Technical Specification Applicability
To Degraded HVAC Equipment
Air Purge Applied To Substantially Mitigate Stack
Release Levels Resulting From BWR Fuel Leak
Waste Processing Air Cleaning
Thursday August 6, 1998
Critical Review: Waste Processing Air Cleaning