Barrier |
Purpose |
Performance |
|
Fall Protection Caddell ES&H Plan, p19 Contract General Conditions (GC-7) p25 |
To standardize the applications of fall protection and outline responsibilities for its safe conduct and use. |
Barrier failed because the plan was not followed. |
|
Signs and Barricades Procedure 29 CFR 1926.200 |
To standardize the application of signs and barricades in hazardous situations and outline responsibilities for their use. |
Barrier failed because the plan was not used and signs and barricades were not installed at the platform or on the stacked boxes 6 feet from the edge. |
|
Platform Construction Requirements 29 CFR 1926.501(a)(2) 29 CFR 1926.501(b)(1) |
To specify the requirements for structural stability and fall protection requirements for platform. |
Barrier failed because the temporary platform was left in place and became an attractive nuisance. The edges of the platform were unsupported, toeboards, guardrails, and anchorage points were not installed. |
|
Job Safety Analysis Caddell ES&H Plan, p17-19 Contract General Conditions (GC-7) p16 |
To identify the hazards associated with use of the platforms and work at heights and the safety measures required to offset the hazards. |
Barrier failed because Job Safety Analysis was not performed and hazards were not addressed for temporary platform at this location or within six feet of edge of stack. |
|
Illumination |
To provide sufficient lighting for the safe accomplishment of work and surveillance/ inspection activities in a construction area. |
Barrier was defeated because lighting in the work area was 2 foot-candles, a level below the required minimum of 5 foot- candles. |
|
Medical surveillance |
To determine the ability of personnel to perform their duties considering the physical condition and health. |
This barrier failed because Caddell Management failed to implement the requirements of their Medical Surveillance Program. |
|
Work restrictions: no work alone, at unprotected heights or operate high-speed machinery |
To specify restrictions to be applied for the Project Engineer's work activities because of health conditions. |
Barrier failed because work restrictions were not implemented by management for a period of 13 months in determining safe work activities for Project Engineer. |
|
Individual judgment |
Individual judgment should identify hazardous situations prior to imminent danger. |
This barrier failed because the Project Engineer's judgment may have been impaired by a hypoglycemic event. |
|
Caddell management approach toward safety |
"ES&H will be given primary importance in planning and operating company activities in order to protect employees against occupational injuries and illness." (Caddell ES&H Plan). |
Barrier failed because Caddell management failed to implement their ES&H Program Plan; did not require a review of all issues during safety engineer turnover; did not react to correct unsafe occurrences; and did not exercise its safety responsibilities. |
Last Modified: Friday, 28-Feb-97 10:09:00