| APPROVED
INTERPRETATION GUIDANCE FOR DOE M 232.1-1A |
"Power Marketing Administrations"
Approved 10/27/97
REQUIREMENT
3. APPLICABILITY.
c. Exclusions.
(2) Power Marketing Administrations' reporting of major electrical
power outages, disturbances, and fuel shortages subject to the emergency
power system reporting requirements prescribed in 10 CFR 205, 350
through 354, "Report of Major Electric Utility Systems Emergencies."
INTERPRETATION
Issue:
Section 3.c.(2) excludes the Power Marketing Administrations' reporting
of major electrical power outages and disturbances. Would this include
the power outage that affected the Western U.S. meaning that contractors
did not need to write an occurrence report for that event if all emergency
equipment functioned properly?
Intent:
The exclusion in Section 3.c.(2) applies only to reporting requirements
for Power Marketing Administrations. This does not exempt facility
operators from any reporting requirements.
Additional Information:
An electrical power outage should always be evaluated against the
reporting criteria of Group 1.H ON(2), even if emergency equipment
functioned properly. For facilities other than the Power Marketing
Administrations, the focus for reporting should be on the consequences
of the outage and not the outage itself. Additionally, the loss of
incoming electrical power could cause conditions that are reportable
under other criteria, therefore, all reporting criteria should be
evaluated to determine reportability.
|