| DOE Occupational Radiation Exposure: 2008 Annual Report Exhibit B-14. Distribution of TEDE by Facility Type Listed in Descending Order of Average Measurable TEDE for Waste Processing, 2008 |
||||||||||||||||
| WASTE PROCESSING |
||||||||||||||||
| Number of Individuals Receiving Radiation Doses in Each Dose Range (rem) | ||||||||||||||||
| Site/Contractor | Less than Meas | Meas 0 - 0.10 | 0.10 - 0.25 | 0.25 - 0.50 | 0.50 - 0.75 | 0.75 - 1.00 | 1 - 2 | 2 - 3 | 3 - 4 | 4 - 5 | >5 | Total Monitored | Percent of Monitored with Meas. TEDE | No. with Meas. TEDE | Collective TEDE (Person-rem) | Avg. Meas. TEDE (rem) |
| West Valley Nuclear Services Inc. | 287 | 66 | 65 | 26 | 444 | 35% | 157 | 22.181 | 0.141 | | |||||||
| Argonne National Laboratory | 145 | 19 | 11 | 2 | 177 | 18% | 32 | 2.810 | 0.088 | |||||||
| Westinghouse Savannah River Co. | 1,589 | 871 | 190 | 63 | 4 | 2,717 | | 42% | 1,128 | | 79.709 | | 0.071 | ||||||
| INL - BEA LLC - Services | 900 | 399 | 89 | 19 | 1,407 | 36% | 507 | 32.136 | 0.063 | |||||||
| Sandia National Laboratory | 79 | 10 | 4 | 93 | 15% | 14 | 0.882 | 0.063 | ||||||||
| SR construction - Parsons | 1 | 1 | 100% | | 1 | 0.058 | 0.058 | ||||||||||
| Westinghouse S.R. Subcontractors | 177 | 81 | 8 | 7 | 273 | 35% | 96 | 5.496 | 0.057 | |||||||
| CH2M HILL HANFORD GROUP INC. | 541 | 239 | 37 | 1 | 818 | 34% | 277 | 13.844 | 0.050 | |||||||
| Brookhaven National Laboratory | 26 | 9 | 35 | 26% | 9 | 0.439 | 0.049 | |||||||||
| Bechtel Jacobs - Paducah | 9 | 21 | 6 | 36 | 75% | 27 | 1.112 | 0.041 | ||||||||
| Misc. S.R.S. Const. Subcontractors | 15 | 5 | 1 | 21 | 29% | 6 | 0.217 | 0.036 | ||||||||
| Advance Technology Laboratories | 22 | 8 | 30 | 27% | 8 | 0.237 | 0.030 | |||||||||
| Los Alamos National Laboratory | 17 | 5 | 22 | 23% | 5 | 0.110 | 0.022 | |||||||||
| NNSA - NORTH AND SOUTH AMERICA | 2 | 2 | 100% | 2 | 0.036 | 0.018 | ||||||||||
| Washington TRU Solutions-WIPP Contractors | 893 | 62 | 955 | 6% | 62 | 1.058 | 0.017 | |||||||||
| Wackenhut Services Inc. - SR | 287 | 60 | 347 | 17% | 60 | 0.984 | 0.016 | |||||||||
| Savannah River Field Office | 61 | 8 | 69 | 12% | 8 | 0.097 | 0.012 | |||||||||
| Washington TRU Solutions LLC-WIPP | 1 | 1 | 100% | 1 | 0.011 | 0.011 | ||||||||||
| SR construction - Parsons Subcontractors | 9 | 1 | 10 | 10% | 1 | 0.005 | 0.005 | |||||||||
| BECHTEL HANFORD | 2 | 2 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| BECHTEL NATIONAL CORPORATION | 2 | 2 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| DOE-RICHLAND FIELD OFFICE | 1 | 1 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| DURATEK FEDERAL SERVICES INC. | 1 | 1 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| FLUOR HANFORD INC. | 3 | 3 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| Miscellaneous DOE Contractors - SR | 11 | 11 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| NNSA - ASIA AND MEMBERS OF THE FORMER SOVIET UNION | 1 | 1 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| NNSA Los Alamos Site Office | 1 | 1 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| Wackenhut Services Subcontractors - SR | 1 | 1 | 0% | 0 | 0.000 | 0.000 | ||||||||||
| Totals | 5,080 | 1,868 | 411 | 118 | 4 | 7,481 | 32% | 2,401 | 161.422 | 0.067 | ||||||
| Note: Arrowed values indicate the the greatest value in each column. | ||||||||||||||||