DOE Occupational Radiation Exposure: 2005 Annual Report
Exhibit B-9. Distribution of TEDE by Facility Type Listed in Descending Order of Average Measurable TEDE for Fuel Facilities, 2005.

FUEL FACILITIES

Number of Individuals Receiving Radiation Doses in Each Dose Range (rem)

Site/Contractor Less than Meas. Meas. 0-0.1 0.10-0.25 0.25-0.50 0.50-0.75 0.75-1.00 1.00-2.00 >2 Total Monitored Percent of
Monitored with Meas. TEDE
No. with
Meas. TEDE
Collective TEDE
(person-rem)
Avg. Meas. TEDE (rem)
ENRICHMENT
British Nuclear Fuels Ltd - (BNFL) - ETTP 475 106             581 18% 106 1.985 0.019
Totals 475 106             581 18% 106 1.985 0.019
FABRICATION
Fluor Fernald - FEMP 586 423 65 25 5       1,104 47% 518 32.748 0.063
Fluor Fernald Construction Subcontractors 272 284 22 11 2       591 54% 319 15.878 0.050
FEMP Office Service Subcontractors 5 3             8 38% 3 0.092 0.031
Fernald Environmental Management Project Office 8 6             14 43% 6 0.111 0.019
Fluor Fernald Service Vendors 1               1 0%   0  
Totals 872 716 87 36 7       1,718 49% 846 48.829 0.058
PROCESSING
Westinghouse Savannah River Co. 962 451 67 23 3       1,506 36% 544 34.485 0.063
Wackenhut Services, Inc. - SR 96 28             124 23% 28 0.761 0.027
Westinghouse S. R. Subcontractors 31 5             36 14% 5 0.053 0.011
Savannah River Field Office 21 1             22 5% 1 0.008 0.008
Los Alamos National Laboratory 1               1 0%   0  
Misc. S.R.S. Construction Subcontractors 1               1 0%   0  
Totals 1,112 485 67 23 3       1,690 34% 578 35.307 0.061

Note: Arrowed values indicate the greatest value in each column.